Weitere Marken von Sievert
Suche

IMBERAL® S100 90B

Bitumen thick-film coating for structural waterproofing, polystyrene-filled
Applications:
  • Cellars in residential and industrial buildings
  • Floor slabs
  • Underground garages
  • Balconies, patios
  • Wet rooms, showers
  • Retaining walls
  • As an adhesive for insulation, protective and drain boards

CHARACTERISTICS
IMBERAL® S100 90B is a pasty, environmentally-friendly, polystyrene-filled thick waterproofing sealant made of bitumen and rubber and containing a hydraulically setting powder. It is resistant to aggressive substances normally occurring in the ground and is not harmful if it enters the groundwater. In its hardened state it is resistant to frost and gritting salt.
  • Easy to apply and work
  • Becomes rainproof quickly
  • Even consistency when applying
  • Highly flexible
  • Low shrinkage
  • Complies with DIN EN 15814

INGREDIENTS
Bitumen, polymers, emulsifiers, functional fillers, fibers, hydraulic binders

    USE
    IMBERAL® S100 90B for waterproofing structural components in contact with soil as per DIN 18533 on walls, foundations and floor slabs in contact with soil as well as earth-covered ceiling panels.
    • Soil moisture and non-pressing water W1-E
    • Against external pressure water, moderate effect W2-E
    • Against non-pressing water on earth covered ceilings
    W3-E
    • Against spray water on the wall plinth as well as
    capillary water in and under walls in contact with
    soil W4-E
    • For waterproofing wall connections to WU concrete
    as well as construction joints and butt joints of
    components made of concrete with high
    water resistance
    • On non-plastered brickwork, concrete, plaster MG P II
    and P III as well as on old cleaned
    bitumen seals
    • As an adhesive for insulation, protective and drain
    boards

    QUANTITY REQUIRED
    acc. to DIN 18533
    Scratch coat

    W1-E
    Soil moisture and
    non-pressing water

    W2-E2)
    Against external pressure
    water, moderate effect

    W3-E2)
    Non-pressing water on
    earth-covered ceilings

    W4-E
    Spray water and ground
    moisture on the wall plinth
    as well as capillary water in and
    under walls

    Quantity as an insulating board adhesive

    W1-E
    Selective adhesion

    W2-E / W3-E3)
    Areal adhesion
    (butt bonding)

    1 - 2 l/m²



    3.3 l/m²



    4.4 l/m²



    4.4 l/m²





    3.3 l/m²




    app. 2-3 l/m2



    app. 3-4 l/m2
    • Depending on the individual construction site, the material amounts indicated above can increase by about 1 - 1.5 l/m2 (due to uneven substrate or uneven material application). Leveling and scratch coats must be considered separately.
    • Waterproofing measures against pressing water do not comply with DIN 18533 and must be approved separately with the customer before waterproofing works start.


    1) At +20°C and 60% relative humidity 2) As a rule a reinforcement fabric will be embedded in the whole area. 3) Please take the construction regulations of the panel manufacturer into considerationPREPARATION OF THE SURFACE
    The substrates must be firm, capable of taking loads, free of dust, dirt and mortar residues. Clean the base projections thoroughly. Completely remove sinter layers and impurities. Outside edges have to be broken, all internal corners have to be designed as coving with INTRASIT® SM 54Z or the fast setting INTRASIT® RZ1 55HSP waterproof mortar. Paint or spray IMBERAL® Aquarol 10D as an undercoat on all absorbent mineral surfaces.
    The substrate can be slightly moist. When there is the danger of penetration by moisture from the back, carry out an intermediate sealing with INTRASIT® DS1 54Z, INTRASIT® Poly-C1 54Z or IMBERAL® RSB 55Z. Old bitumen sealing that has stuck fast can be reworked with PMBC after cleaning. Close open joints, pores and voids up to 5 mm with IMBERAL® S100 90B as the scratch coat. Close joints wider than 5 mm, mortar pockets and holes with INTRASIT® SM 54Z or INTRASIT® RZ1 55HSP. Scratch coats and channels must have hardened before the waterproofing work begins.

      APPLICATION
      DIN 18533 – Waterproofing of buildings
      DIN 1053 – Masonry
      Follow the directive for the design and planning of structural parts in contact with the ground with plastic-modified bitumen thick coating.

      Mixing:
      Shortly stir the liquid component with a slowly rotating stirring tool with paddle (400 to 600 rpm) and intensively mix-in the entire powder component. The mixing process takes approx. 1 minute and is finished when the mass is homogeneous and free of lumps.

      Surface sealing:
      PMBC is processed in at least two passes. In case of soil moisture and non-pressing water as well as in the plinth area, the sealing layers can be applied whilst still wet. Against external pressure water, moderate effect, and with non-pressing water on earth-covered ceilings, the reinforcement IMBERAL® VE 89V is integrated in the first layer. The second layer is sealed when the first bonding layer is no longer damaged.

      Plinth and areas exposed to spray water:
      When plastering subsequently or in the area of the clinker contact area we recommend waterproofing these areas with IMBERAL® RSB 55Z.

      Movable joints:
      Carry out and integrate in the surface sealing expansion and structural joints with joint sealing tape IMBERAL® FAB 89ZH.

      IMPORTANT NOTES
      • Maintain a working temperature of +5 °C to +35 °C.
      • Bubble formation due to deep pores or hollows in concrete should be prevented or reduced by means of scratch plastering.
      • Do not apply the product in direct sunlight.
      • If possible, arrange waterproofing penetrations in the area of soil moisture, non-standing seepage water. Here, the bitumen thick-coating can be processed to the penetration like channels.
      • Use adhesive flanges or loose/fixed flanges for passages where there is water not under pressure. Openings in accumulating seepage water or ground moisture areas must always be made with loose/fixed flange screw connections.
      • Gullies must be reinforced with plate edging or sheeting, integrating a woven tape.
      • Apply protective layers and protective measures according to DIN 18533.
      • Any devitations from DIN 18533 must, as a rule, be contractually agreed separately.
      • When laying perimeter insulation boards, also see the information sheet on the thermal insulation of components in contact with soil by the professional association Polystyrol-Extruderschaum (FPX).
      • Clean tools and equipment with water immediately after use.

      SAFETY PROVISIONS/RECOMMENDATIONS
      Powder component contains cement and causes alkaline reaction when coming into contact with moisture or water. For further information on safety when transporting, storing and handling, please refer to the current safety data sheets.

        DISPOSAL
        The local waste removal regulations must be observed.

          SPECIFICATIONS
          Packaging
          Mixer pack size
          Supplied
          Density, process ready
          Working temperature
          Working time
          Softening point (ring and ball)
          Elongation
          Max. tensile strength
          Crack bridging
          - without fabric insert
          Slot pressure test according to
          DIN EN 15814
          Fully hardened and load
          bearing1)
          Storage
          PE bucket/paper sack
          30 l
          17 pack sizes/pal.
          approx. 0.75 kg/l
          +5 °C to +35 °C
          > 1 hour
          > 100 °C
          approx. 130 %
          approx. 0.25 N/mm2

          > 2 mm at +4 °C

          > 0.75 bar

          after 2 days
          frost-free and cool,
          9 months


            System products