
Areas of application:
Reference value for 30 cm lime-sandstone masonry using the drill hole method The quantity required depends on the absorbency of the masonry. | approx. 0.5 l/linear metre |
Creating a horizontal damp course using the drill hole method | ||
1. | Drill the holes - Drilling hole diameter: 18 mm - Inclination: 25° - Vertical offset: 10 cm - distance between drill holes: 12 cm - The holes can drilled in 1 or 2 rows depending on the quality of the masonry and the degree of moisture penetration. For moisture saturation above 75 %, the horizontal damp course must be created in 2 rows. - Cross at least 1 horizontal joint if possible | |
2. | Blow the drill holes. | |
3. | Fill large cavities with INTRASIT® BLS 54TR and re-drill after 1 to 2 days. | |
4. | INTRASIT® MEK 18OS with water in a mixing ratio of 1 : 10 for masonry with high moisture penetration, or up to 1 : 14 for lower levels of moisture penetration. | |
5. | Impregnation is done in alternating sequence while the product is still wet. Impregnation time for pressureless injection is at least 8 hours. Use a storage container for horizontal damp course product. | |
6. | Alternatively, the material can be injected using the low-pressure method (up to max. 10 bar). | |
7. | Wash all processing equipment with clean water immediately after use. |
Packaging Container size Delivery form Application temperature Density Storage | PE container/ tin bucket 20 l / 5 l 24 / 72 containers/palle +5 °C to +35 °C 0.99 kg/l frost-free, 12 months |