Weitere Marken von Sievert
Suche

GALABAU RJM-P 1K

Ready joint mortar paving, 1-comp., ready-to-use
Applications:
  • New grouting and maintenance of areas capable of being drained.
  • Gardens and parks, walkways, courtyards
  • With a strong enough foundation suitable for areas where there is not much vehicle traffic

CHARACTERISTICS
GALABAU RJM-P 1K is a ready-to-use, water-permeable grout (joint mortar) for concrete stone and natural stone paving, flagstones and clinker brick surfaces. Can be easily washed or slurried into the joints and leaves no cavities. The new surface is easy to clean with a water-tolerant recipe.
  • Water permeable – open-pored
  • Hardens via oxygen from the air
  • Ready to use
  • Frost-proof
  • Prevents weed growth
  • Suitable for street sweepers

INGREDIENTS
Reactive synthetics, natural sands

    USE
    GALABAU RJM-P 1K is used for the new jointing and renovation of natural stone, concrete stone and clinker brickwork.

    QUANTITY REQUIRED
    Large cobble stones
    160 × 190 mm
    140 × 170 mm
    Small cobble stones
    100 × 100
    90 × 90
    Mosaic cobble stones
    60 × 60
    50 × 50

    approx. 5.0 kg/m2
    approx. 5.5 kg/m2

    approx. 9.0 kg/m2
    approx. 9.5 kg/m2

    approx. 13.0 kg/m2
    approx. 16.0 kg/m2


      Calculation example - Jointing width: 8 mm / jointing depth: 30 mm 1) At +20 °C and 60 % relative humidity.PREPARATION OF THE SURFACE
      The substrate must be sufficiently load bearing and must be correspondingly designed for future dynamic loads. The joint flanks must be free of all types of impurities.
      The complete structure must be water permeable so that no water is able to stagnate in the joints.

      Prerequisites:
      Minimal joint width:
      Minimal joint depth:
      -for small cobble stones
      -for large cobble stones








      5 mm

      25 mm
      30 mm


        The surface to be grouted should be constructed in such a manner that later loads do not cause any loosening of the lining‘s joints. Before the application of the mortar, the surface must be moistened with water spray; however, no water may stagnate in the joints themselves.APPLICATION
        The material is ready to use. Tip out from the vacuum plastic bag in the PE bucket directly on to the paving surface (well wetted). Brush in to the joints or wash in as a slurry. If the grout is washed in as a slurry, then it will compact better and the cohesiveness will be higher.
        1.Cut open the plastic vacuum bag and pour contents onto the well-moistened paving surface.
        2.Grouting with
        GALABAU RJM-P 1K is done by slurrying in the material with a squeegee or a suitable brush. For this, we recommend forming the grout into a suitable slurry by using sufficient water.
        3.After 15-20 minutes the joints are compacted with a medium-hard brush, lengthwise and sideways. Brush off any residue on the stone surface and completely remove with water mist. The pavement must not be allowed to dry out completely until it has been completely cleaned.
        4.Immediately after use, clean all processing equipment with water.

        IMPORTANT NOTES
        • Adhere to the processing temperature from +5 °C to +30 °C.
        • The sub-base (foundation) must be able to bear a load and sufficiently permeable so as to prevent any subsidence (settlement) or frost damage.
        • The freshly jointed surface must be protected from frost for at least 24 hours. A strain due to rain, etc. must be correspondingly avoided. Do not subject the joints to a load too early.
        • Carry out a preliminary test.

        SAFETY PROVISIONS/RECOMMENDATIONS
        The usual hygiene measures and safety precautions applicable to the handling of chemical products must be observed. Make sure you wear the correct protective clothing.

          DISPOSAL
          The local waste removal regulations must be observed.

            SPECIFICATIONS
            Packaging
            Container size
            Delivered as
            Colours/Shades
            Working temperature
            Processing time1)
            Wet raw density
            Compression strength, 7 days
            Joint width
            Can be walked on after
            Can take a full load after
            Storage
            Vacuum bag/PE bucket
            15 kg
            50 containers/pallet
            sand, stone grey, basalt
            +5 °C to +30 °C
            approx. 30 minutes
            1.8 kg/l
            approx. 8 N/mm2
            5 – 30 mm
            after approx. 24 hours
            approx. 7 days
            frost-free, at least 12 months but only in a closed/sealed container